Jurong East Integrated Transport Hub (Jurong Gateway Hub): What Is Being Built, When It Is Due and What It Means for Jurong East Avenue 1 EC
The Jurong East Integrated Transport Hub is the large building going up beside Jurong East MRT station, on the land where the old bus interchange used to be. URA’s Master Plan 2025 calls it Jurong Gateway Hub. If you are thinking about Jurong East Avenue 1 EC, it is the transport and civic centre your household will use most. This guide explains what LTA and URA have said is being built, when it is due, what is under construction around it today, and how its timeline lines up with the EC’s. All facts are as at 2 November 2026.
What is being built
LTA awarded the design-and-build contract to China Communications Construction Company Limited (Singapore Branch) on 4 February 2021, at a contract value of S$477.4 million. LTA and URA describe the hub like this:
| Part of the hub | What has been announced |
|---|---|
| Building | A 27-storey tower block joined by a sky bridge to an eight-storey podium block (LTA) |
| Transport | A bus interchange inside the development, linked to the adjacent Jurong East MRT station (LTA, URA) |
| Rail transfers | Direct, more convenient transfers between the North-South Line, East-West Line and the future Jurong Region Line at Jurong East station (LTA) |
| Other uses | Offices, shops, and community and civic facilities. URA names a library, a community club and sports facilities as examples (LTA, URA) |
| Accessibility | Barrier-free alighting areas and toilets, priority queue zones with seats, and a nursing room (LTA) |
| Place in the West | The fifth integrated transport hub in the West Region, after Boon Lay, Clementi, Joo Koon and Bukit Panjang (URA) |
LTA and URA have not yet said which operators will run the library, community club or sports facilities, or who will occupy the office tower. Don’t count on any particular tenant until one is announced.
When will it be completed?
LTA’s target is around 2027. It gave that date when the bus interchange moved in November 2020, and again at the contract award in February 2021, when it said construction would start in the second quarter of 2021. As at 2 November 2026, we have found no newer LTA announcement that confirms an opening date or changes it. URA’s Master Plan 2025 says only that the hub will connect the bus interchange to the MRT station “when completed in the coming years”.
Treat “around 2027” as a target, not an opening date. LTA will need to announce when buses move into the new interchange, and that will be the date to rely on.
Where buses run from until then
Since Sunday, 6 December 2020, Jurong East buses have used a temporary interchange across the road, on Jurong Gateway Road between Jurong East Street 12 and Jurong East Central 1. LTA says it will stay in use until the hub is completed around 2027. A sheltered overhead bridge with lifts and escalators links it to the MRT station. For berths, route changes and how to try the current transfer yourself, see our guide to the temporary bus interchange.
Construction you will see around Jurong East now
If you visit the area before the EC launches, three public projects explain most of the hoardings and road works near the MRT station:
- The transport hub itself, on the former bus interchange land next to Jurong East MRT, under the 2021 contract above.
- The Jurong Region Line (JRL). Jurong East (JE5) is on Stage 2, which runs from JE1 to JE7, Tengah to Pandan Reservoir, and will become an interchange with the North-South and East-West Lines. LTA’s project page lists Stage 2 for 2028.
- Cross Island Line (CRL) Phase 2, which extends the line west to a Jurong Lake District station. LTA reported early-stage tunnelling under way in March 2026, and the phase is slated for completion in 2032.
These works affect the roads and walkways around the MRT station for now. They are not the EC’s own construction. The Jurong East Avenue 1 land has not been tendered yet, so no work for the EC has begun.
Has the JRL date moved?
Partly. On 4 March 2026, LTA said JRL Stage 1 (Choa Chu Kang to Boon Lay and Tawas) needs another six months and will open around mid-2028 instead of end-2027. It gave two reasons: viaduct work over the Pan-Island Expressway could only be done during overnight road closures, and a viaduct over a canal needed more ground reinforcement. For Stages 2 and 3, LTA said it will “provide further updates on the opening dates … as works progress”. The project page still shows Stage 2, which includes Jurong East, for 2028 and Stage 3 for 2029. Read the Jurong East interchange date as 2028, with an update from LTA still to come.
How the hub’s timeline fits the EC’s
The hub is under construction under a contract awarded in 2021. The EC is still at the land-sale stage. As at 2 November 2026, HDB’s list of residential sites open for tender does not include Jurong East Avenue 1. HDB’s Government Land Sales listing estimates the tender launch for December 2026, and URA’s 2H2026 programme estimates about 735 homes on the 1.49-hectare site. The developer, project name, price, unit mix and completion date have not been announced yet. Our land sale guide sets out each step from tender to booking.
Two points follow for buyers:
- The hub and the JRL interchange are due well before any EC completion. A tender launched in December 2026 still has to close, be awarded and lead to a sales launch, and the completion date will only be set after that. If LTA keeps to its targets, Jurong Gateway Hub and the JE5 interchange should already be running when residents move in. That is a timing point, not a promise about prices.
- Plan for a long stay. HDB says EC projects whose land sales tender closed on or after 8 May 2026 can be sold on the open market only after a 10-year Minimum Occupation Period, counted from TOP. This tender has not closed, so under HDB’s current rules the 10-year MOP would apply here. Our income ceiling and MOP guide explains the cut-off dates.
What is still unknown
- A firm opening date for the hub and its new bus interchange.
- Confirmed opening dates for JRL Stages 2 and 3.
- The walking route and time from Jurong East Avenue 1 to the hub. These depend on where the developer places the EC’s entrances, so we do not quote a walking time.
To see where the site sits in relation to the station, use our location page. Prices will go on the price page once the developer releases them. Layouts will appear on the floor plans page, and preview arrangements on the showflat page, once a developer is appointed. Until then, contact us if you would like to be told when the tender launches.
Get Jurong East Avenue 1 EC Updates First
Get the latest price list, available units and floor plans for Jurong East Avenue 1 EC — no obligation.